4 seasons sunroom with multi-level stone terrace

The project

4 seasons sunroom with multi-level stone terrace, supported by Postech thermal screw piles.
  • Year 1900
  • Implementation Dev Postech Eastern Alberta
  • Equipment used Equipment used
  • Pile Pile used