PAVILION OF AMPHIBIANS AND REPTILES – BIOPARC OF GASPÉSIE

SEO_Vistech_Postech_Bonaventure_bioparc_structure_close_to_water

The project

Extension of the pavilion of amphibians and reptiles.
  • Year 2015
  • Implementation Vistech Gaspésie
  • Equipment used Excavator: Kubota KX 41-3 equipped with a sun gear and a strong motorPiles: 27 P312L7-12 piles, 4 P400L7-12 piles, 1 P512L7-12 piles and associated extensionsLoad cellCalibration cell
  • Pile P312L7-12, P400L7-12, P512L7-12

Postech Screw Piles installers

Our certified experts are your neighbors

Every Postech installation is quick and easy, and there’s a certified expert installer near you who will guarantee that your project starts on the right footing.

Find your local Installer