Skip to main content
Postech

WHAT SETS OUR PILE APART

WE DON'T JUST MAKE IT. WE PROVE IT.

Every Postech pile is engineered in-house, welded by CWB-certified welders, and hot-dip galvanized. Then its load is verified on site, pile by pile. That last step is the one concrete cannot match.

Engineering and manufacturing, in-house.

We design, weld, and galvanize our own piles in-house, across a North American manufacturing network. The team that engineers the pile is the team that answers your installer's questions.

Postech headquarters and manufacturing facility in Sherbrooke, Quebec

Welded right. Coated for the long run.

CWB-certified welds. Every joint is welded to the Canadian Welding Bureau standard, not by hand and hope.

Hot-dip galvanized as standard. The zinc coating bonds to the steel and works underground, where you will never see it.

Close-up of a hot-dip galvanized Postech screw pile head

Capacity you can measure, on every pile.

As each pile is driven, the installer reads its torque and confirms the load it can carry, right there on your lot. A poured footing offers no equivalent check in the field.

Compliant where it counts.

Postech piles meet the National Building Code of Canada (NBC) and the International Residential Code (IRC) in the United States. Full documentation lives in the Engineering section.

Want this standard on your project?

A certified Postech installer in your area assesses your site and prepares a free quote.

CallWindsor, ONContact Us