A Postech installation follows three simple steps.
First, a certified installer assesses your soil and project to select the right pile diameter and depth.
Second, a hydraulic excavator drives each pile below the frost line (typically 6 feet or more depending on your region) until it reaches the torque rating required for your load.
Third, the bracket is set and leveled.
And that's it.
No concrete to mix, no curing time to wait for, no excavation to backfill. Most residential projects are complete within a single day.







