Skip to main content
Postech

Jiffy Lube built on a solid foundation

Aug 25, 20222 min read

How many screw piles and how long did it take?

The challenges of the project

The Postech advantages

"It was a 3 men’s job, and it took 4 full days to build the foundation for the building" shared with us Kevin Musgrove of Postech Moncton. Our Postech’s team used 52 helical piles of P312L7-12. The Helical piles from Postech were built to be able to support heavy loads in compression, in traction and laterally. Therefore, the client was confident in our product and our execution.

During this project there was a lot of ground water on site. This resulted in very muddy conditions. Piles are a better choice in areas where ground movement is common due to soil liquefaction or groundwater problems.

Structures may be subjected to horizontal forces that affect the foundation. The use of a helical pile foundations helps to reduce the bending action as well as support the vertical load that comes onto the foundation. As a result, helical pile foundations were required for the construction of this structures and can be recommended when building structures that are highly susceptible to water effects.

By working with Postech Screw Piles, you can ensure that your foundation for your project is solid. It doesn’t require any maintenance, is simple to install, is fast and leaves the site clean. A quick and sustainable way to start building your project on solid foundation.

Get started and find your local installer!

Back to all articlesHave a project? Find an installer
CallWindsor, ONContact Us