Skip to main content
Postech

SCREW PILE FOUNDATIONS FOR CONTRACTORS & BUILDERS

Faster installations, fewer callbacks, higher margins per job. Postech screw piles are used by thousands of contractors across North America because they work, and because they are faster than concrete.

WHY POSTECH

Faster Installs. No Excavation. More Projects Per Season.

Postech screw piles let contractors install code-compliant foundations in hours, not days. No excavation, no formwork, no curing.

Structures are ready to build on the same day as foundation installation, which means more jobs completed per season.

Concrete creates scheduling dependencies that eat into margins: excavation crews, formwork setup, 24–72 hours of curing, then site cleanup before the next trade begins. On a typical deck or addition, that's 1–2 days of downtime built into every job.

Postech eliminates that downtime. Installation takes a few hours. The build starts the same day. Real-time torque monitoring confirms load capacity on-site. No lab turnaround, no waiting for paperwork.

+ Same-day foundation & immediate build start

+ No excavation crew or formwork subcontractors

+ Clean sites — no excavated material, no curing mess

+ Real-time load verification — no lab delays

+ Lifetime structural warranty for your clients

+ Fewer callbacks on certified, engineered foundations

+ Residential decks & patios + Sheds & outbuildings

+ Sunrooms & home additions + Solar panel ground mounts

+ Cottage & cabin foundations + EV charging station pads

+ Fence post foundations + Multi-unit residential

WORK WITH US

Running multiple projects per season?

Contact the commercial team to discuss volume arrangements and connect with certified Postech installers in your region who specialize in contractor partnerships.

CallWindsor, ONContact Us