Skip to main content
Postech

Headquarters

Built in Sherbrooke. Trusted Across North America.

Postech screw piles are engineered, welded, galvanized, and tested in a single facility in Sherbrooke, Quebec (Canada). Combining administration, research and development, and manufacturing under one roof is what lets us hold the quality standard that 150+ dealers across Canada and the United States install on every project.

One Facility. Three Disciplines.

Most pile manufacturers separate engineering, manufacturing, and customer support across different sites or different companies. We do not.

The administrative team that signs your warranty sits in the same building as the welders who fabricated your pile.

That proximity matters. When a dealer in New Brunswick reports a soil condition we have not seen before, the engineering team can prototype, test, and ship a solution in the same week, not the same quarter.

It also keeps every pile traceable. Every pile that leaves the facility carries a batch identifier tied back to the steel mill, the welder, and the galvanization run. If a question ever comes up 15, 40 or even 75 years later, the answer is in our records.

MANUFACTURING STANDARDS

What Gets Built Here

CWB-certified welding

Every welder on the floor holds an active Canadian Welding Bureau (CWB) certification. Every pile is welded to the same code that bridges and pressure vessels are.

Galvanized steel on every pile

Galvanization is standard, not an upcharge. Steel is hot-dip galvanized after fabrication so that every weld and every cut edge is protected.

In-house research and development

Our R&D team designs and tests every new pile geometry, including the Thermal Pileâ„¢, in our own lab before it reaches a customer site.

Batch-level traceability

Every pile carries a batch identifier. We can pull the steel source, the welder, and the galvanization run for any pile we have ever shipped.

From Raw Steel to Your Foundation

Raw structural steel arrives from North American mills and is cut, formed, and welded into pile shafts and helices on our shop floor.

Every weld is inspected before the pile moves to galvanization. Every galvanized pile is inspected again before it ships.

Finished piles are loaded onto trucks bound for the dealer who ordered them.

Your local Postech dealer then drives them into the ground on your project, often the same week.

From mill to ground in under a month: the pile in your foundation was steel in a Quebec mill less than 30 days ago.

Ready to Build With Us?

Find a certified Postech installer near you and get a free quote. Most residential foundations are installed in a single day, with the same piles you just read about.

CallWindsor, ONContact Us