Bridge – Jardin Scullion

Installation of 24 piles overhanging a stream at depths ranging from 50 to 60 feet.

EQUIPMENT AND MATERIAL

  • Excavator: Yanmar Vio-20 equipped with a sun gear and a strong motor
  • Piles: 24 P312L10-24 piles
  • Extensions: 60 EX312L10 extensions
  • Special heads with 12 ” X 12 ” X ¾ ” plate

Sign up for our newsletter

For information, inspiration or to help you build your dream projects on Postech Screw Piles!